![]() The OSHA standard for The Control of Hazardous Energy (Lockout/Tagout). (Find out who's allowed to unlock equipment that's been locked and tagged out.) Lockout/Tagout Makes a Difference Include protocols that outline a process for the removal of tags and locks, and that startup is supervised by qualified personnel. ![]() Make sure there are specific steps in place to recommission the piping network and process system. Adapt LOTO Protocols with Changes in OperationĪs system operation procedures change over time, it will be necessary to evolve your LOTO procedures alongside them. Substitute locks belonging to a leaving shift with the locks of the arriving shift. Notify all affected workers and provide specific instructions in the event of a shift change while equipment is still locked out. Establish LOTO Protocols for Shift Changes All gases and fluids in isolated piping networks and process systems should be depressurized, emptied, and decontaminated. After all tags and locks are installed, the equipment and systems should be tested to make sure they are no longer in operation. Release All Stored EnergyĮnsure that all stored energy is released or neutralized, including electrical, pressure, fluids, gas, and mechanical. Qualified personnel must verify that all energy is locked out of the system. ![]() Once the processing system or piping network has been isolated and locked out, an attempt to restart the equipment should take place to confirm that there are no secondary sources of energy. It is crucial that all lockout/tagout resources identify the responsible worker and supervisor. ![]() Tags must be securely attached to all lockout points, clearly indicating deactivation, danger, and do-not-operate instructions. Use a system of worker-assigned locks, including bland flanges and slip blinds. Outline the Responsibilities of Authorized Workers Provide a specific lockout procedure for each type of maintenance or potential emergency, including a checklist of lockout points. Deactivate and Remove Content from the Process System Notify all affected employees that the piping network and process system is being serviced or maintained and that LOTO procedures are in place. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |